Can DEM Reduce Maintenance Costs in Bulk Material Equipment 

Table of Contents

In bulk material handling operations, maintenance costs are driven largely by wear, spillage, blockages, and unplanned downtime. These issues are often treated reactively, once damage has already occurred. Discrete Element Method (DEM) simulation provides a data-driven way to understand why these problems occur and how they can be reduced at the design and upgrade stage. 

DEM allows engineers to simulate the behaviour of bulk materials as individual particles, capturing impact forces, sliding abrasion, flow patterns, and material interactions with equipment surfaces. When applied correctly, DEM is a powerful tool for reducing maintenance cost, extending component life, and improving equipment availability.

Identifying Wear Zones Using DEM

Wear does not occur uniformly across bulk handling equipment. Chutes, hoppers, transfer points, and liners experience highly localised impact and abrasion depending on material velocity, drop height, particle size, and flow regime. 

DEM simulations track particle trajectories, velocities, and contact forces, allowing engineers to identify: 

  • High-impact zones caused by free-fall or directional changes 
  • Abrasion-dominated zones where material slides continuously 
  • Areas of recirculation or build-up that accelerate wear 

By quantifying impact energy and sliding contact intensity, DEM enables targeted maintenance strategies and informed material selection, rather than blanket liner replacement. 

Optimising Liner Layouts and Equipment Design 

Once wear zones are understood, DEM can be used to optimise liner layouts and equipment geometry. Rather than relying on standard liner configurations, simulations allow different liner materials, thicknesses, and geometries to be tested virtually. 

This approach enables: 

  • Strategic placement of high-wear-resistant materials only where required 
  • Reduced liner thickness in low-wear zones 
  • Geometry changes that reduce particle velocity and impact angles 

The result is extended liner life, lower replacement frequency, reduced downtime, and improved material flow consistency. 

Preventing Spillage and Material Loss 

Spillage is a common contributor to maintenance cost, safety risk, and lost production. It is often caused by poor transfer point design, excessive material velocity, or changes in flow behaviour due to wear. 

DEM simulations provide visibility into: 

  • Particle trajectories at transfer points 
  • Overflow conditions and edge impacts 
  • The influence of chute angles, hood geometry, and containment features 

By optimising transfer designs using DEM, spillage can be significantly reduced, improving housekeeping, safety, and overall operating cost.

Reducing Unplanned Downtime Through Predictive Insight 

Unplanned shutdowns are one of the most expensive events in bulk material handling operations. DEM supports a shift from reactive to predictive maintenance by identifying components at risk of accelerated wear or flow instability. 

With DEM-informed insights, operators can: 

  • Predict liner and component life more accurately 
  • Schedule maintenance during planned shutdowns 
  • Avoid catastrophic failures and emergency repairs 

This directly improves equipment availability and operational reliability. 

Maintenance Cost Reduction and Return on Investment 

The financial benefit of DEM is realised through multiple cost-saving mechanisms: 

  • Reduced frequency of liner and component replacement 
  • Lower labour costs associated with emergency maintenance 
  • Reduced production losses due to unplanned downtime 
  • Extended service life of capital equipment 

While the exact return on investment varies by application, DEM is most effective when used early in the design phase or strategically during upgrade planning, where small geometry changes can deliver substantial long-term savings. 

When Should DEM Be Applied? 

DEM delivers value across the full equipment lifecycle, including: 

New Installations 

DEM allows designs to be validated before fabrication, reducing commissioning issues and early-life wear problems. 

Upgrades and Modifications 

Simulations can assess the impact of increased throughput, material changes, or equipment replacements before capital is committed. 

Troubleshooting Existing Systems 

DEM helps diagnose the root cause of chronic wear, spillage, or blockages that are difficult to resolve through inspection alone. 

DEM Services by Crush & Screen WA 

Crush & Screen WA provides DEM simulation services to support bulk material handling operations across Western Australia. Our focus is on reducing maintenance cost, improving equipment reliability, and supporting informed engineering decisions. 

Our DEM services include: 

  • Wear and impact analysis 
  • Liner and chute optimisation 
  • Transfer point and spillage reduction studies 
  • Pre-installation design validation 
  • Upgrade and throughput assessment 

By understanding how your material behaves in your specific equipment, DEM enables smarter maintenance planning and more resilient designs.